Data Center & Power Infrastructure
UPS & Uninterruptible Power
Online UPS sized from measured load and declared growth, with battery autonomy calculated at the load it will really carry.
A UPS does two jobs and they are often confused. The first is ride-through: carrying the load through the seconds between a mains failure and a generator taking over, or through a dip too short for anything else to notice. The second is conditioning: presenting clean, regulated power to equipment regardless of what the incoming supply is doing. Only an online double-conversion topology does the second properly, which is why it is specified for IT loads even though line-interactive units cost less.
Sizing is where most installations go wrong. A UPS matched to present draw has no headroom, and battery autonomy quoted at half load is roughly halved when the room fills up — so a unit advertised at thirty minutes can deliver well under ten by the time it is doing the job it was bought for. Present load, expected growth and required autonomy are three separate numbers and all three have to be stated.
Batteries are also the part that ages. Valve-regulated lead-acid strings degrade steadily and fail suddenly, usually under the load they were installed to protect against, so periodic testing and a replacement plan are part of the design rather than an afterthought.
What this covers
Online double-conversion UPS
Full conditioning and zero transfer time for IT and security loads, in single-phase and three-phase capacities.
Autonomy design
Battery strings sized against the required runtime at the real projected load, with the calculation shown rather than a nameplate figure quoted.
Redundancy topologies
N+1 and parallel configurations where a UPS failure or a maintenance window must not take the load down with it.
Generator coordination
Transfer switching and start signalling arranged so the generator picks up inside the UPS's ride-through window rather than after it.
Monitoring and testing
Alerting on battery health, load and events, with periodic discharge testing so a weak string is found deliberately instead of during an outage.
What we will ask you
These are the questions that decide the specification. Having the answers ready is what turns a first conversation into a real quotation.
- 01
What load, and what load in three years?
Sizing to today's draw leaves no headroom. State present load and expected growth separately so the design can carry both.
- 02
How long does it actually need to run?
Bridging to a generator is a matter of seconds. Riding out an outage with no generator is tens of minutes, and that is a completely different battery plant.
- 03
Who tests the batteries, and how often?
Batteries degrade silently and fail under load. Without a test regime the first real discharge is also the test, and it usually fails.